Construction Of Our New Building!
- Lifegate Inc.

- Mar 16, 2018
- 0 min read
Updated: Mar 5, 2020
2017_03_24 Ground Breaking RMP 2017_03_24 Ground Breaking CSP 2017_03_24 Ground Breaking RSR 2017_03_24 Ground Breaking KD 2017_03_24 Ground Breaking Prayer 2017_03_24 Ground Breaking Pano 2017_03_24 Ground Breaking Pano w_stone 2017_03_30 Building site excavation 2017_03_24 Cline Equipment 2017_03_24 Driveway Entrance 2017_03_31 Rain in building site 2017_03_30 Stone delivery 2017_03_30 Parking Lot w_roller 2017_04_03 Stone in building site 2017_04_06 Chris and Rusty gluing pipe 2017_04_06 Chris in sewer trench 2017_04_06 Sewer excavation 2017_04_06 First sewer pipe 2017_04_06 Site ready for foundation work 2017_04_06 Sewer stubbed into building 2017_04_10 Backfilling piers 2017_04_06 Water stubbed into building 2017_04_10 Digging holes for piers 1 2017_04_10 Band board installation 2017_04_10 Digging holes for piers 2 2017_04_10 Foundation crew arrives 2017_04_10 JLG machine delivered 2017_04_10 Foundation package delivered 2017_04_10 Laying out the foundation piers 2017_04_10 PermaColumns for foundation 2017_04_10 Spinning of the dirt 2017_04_17 Concrete pour 1 2017_04_17 Concrete pour 2 2017_04_17 Concrete pour 3 2017_04_17 Concrete pour 4 2017_04_17 Concrete pour 6 2017_04_17 Concrete pour 5 2017_04_17 Concrete pour 7 2017_04_17 First concrete for floor 2017_04_17 Pastor Ricky placing mesh 2017_04_17 Pastor Ricky w_Smally 2017_04_17 Sawing concrete 2017_04_17 Setting concrete grade 2017_04_26 Framing walls on the ground 2017_04_20 Finished floor with rain 2017_04_26 Cutting framing members 2017_04_26 Lumber package for framing 2017_04_27 Setting south trusses 2017_04_26 Walls ready to stand up 2017_04_27 Setting trusses 2017_04_27 Standing up the west wall 2017_04_28 Airlock south wall 2 2017_04_28 Airlock south wall 2017_05_01 Window framing 2017_05_02 Siding and windows on south 2017_05_02 Siding on north west end 2017_05_02 Windows and accent siding 2017_05_08 Crew on lift doing siding 2017_05_02 Windows and siding on south 2017_05_08 Siding on south east corner 2017_05_08 Sliding roofing off gradall 2017_05_09 Gradall with roofing on east side 2017_05_09 Rain on the floor 2017_05_09 Roofing the west side 2017_05_09 Roof finished 2017_05_09 Setting the scissor lifts inside 2017_05_10 Closing the north end siding 2017_05_10 Insulating the building 2017_05_10 Drying out the floor 2017_05_10 Setting the front door 2017_05_11 Framing the interior girts 2017_05_11 Interior wall finished 2017_05_11 Interior wall girts and vapor barrier 2017_05_11 Setting interior wall brackets 2017_05_11 Setting posts for interior wall 2017_05_12 Ceiling vapor barrier and ceiling panels 2017_05_12 FBI Crew minus one 2017_05_13 Overhead doors with Mike 2017_05_12 Interior framing done 2017_05_31 Breakers in panels 2017_05_15 Building is closed in 2017_05_31 Toby setting pans for panels 2017_05_31 Toby setting the meter 2017_06_05 Toby bolting wall plates 2017_06_05 Toby installing ground rod 2017_06_14 Toby installing ceiling conduit 2017_06_08 Terry and Scott framing offices 2017_06_08 Conduit up to the ceiling 2017_06_09 Rest rooms framed and decked 2017_06_09 Scott nailing floor decking 2017_06_12 Mark grading west dirt 2017_06_12 Skid steer grading west dirt 2017_06_13 West side rough grading 2017_06_14 East side rough grading 2017_06_30 RMP installing flex wiring 2017_07_08 Hanging the shop HVAC unit 2017_07_12 Toby wiring the panels 2017_07_19 RMP HVAC wiring outside 2017_07_17 Bathroom vents 2017_07_19 Shop HVAC ductwork 2017_07_26 Plumbing roughin mens room 2017_07_26 Scott hanging drywall 2017_07_27 First toilet working 2017_07_31 Office HVAC and water heater 2017_08_18 Data wiring in the walls 2017_08_23 Framing for bronze plaque 2017_08_24 Drywall delivery 2017_08_28 Drywall hanging in shop 2017_08_28 Drywall install lunch 2017_08_28 First sheet of drywall in offices 2017_08_28 Endeavor data pedestal 2017_08_28 Endeavor fiber optic install 2017_08_28 Endeavor fiber optic testing 2017_09_12 Drywall finishing office 2017_09_12 Drywall finishing shop 2017_09_25 CSP Painting office 2017_10_04 Ceiling hangers for drop ceiling 2017_09_26 Scott painting office 2017_11_03 Carol painting above kitchenette 2017_10_06 Scott vacuuming walls 2017_10_05 Terry hanging drop ceiling 2017_10_06 Lights in the drop ceiling 2017_10_06 RMP & Scott drop ceiling 2017_10_06 Scott hanging drop ceiling 2017_10_06 RMP office lights 2017_10_18 Office ceilings done 2017_10_18 Drop ceiling in office 2017_10_20 Terry painting overhead doors 2017_10_27 Propane tank and copper line 2017_10_27 Propane tank and truck 2017_10_27 Propane tank 2017_10_31 Sidewalk forms 2017_11_03 Backfilling sidewalk forms 2017_11_03 RMP compacting sidewalk fill 2017_11_09 Floating sidewalk 2017_11_09 Mark floating sidewalk 2017_11_09 John pouring concrete sidewalk 2017_11_09 John brooming sidewalk 2017_11_09 Pouring concrete sidewalk 2017_11_09 Scott Mark chalking lines 2017_11_09 Striking off sidewalk 2017_11_09 Sidewalk poured 2017_11_10 Mark sawing relief joints 2017_11_16 Installing drains on east side of building 2017_11_16 RMP Backfilling drain trench 2017_11_16 RMP Scott gluing pipe 2017_11_16 RMP excavating drain trench 2017_11_17 Backfilling dirt into drain trench 2017_11_17 Placing concrete stoop northeast 2017_11_17 Connecting downspouts to drain 2017_11_18 Storm water flowing 2017_11_20 Preping for concrete on east side 2017_11_20 Rough stone for concrete pad 2017_11_22 Forms for east unloading area 2017_12_04 Painting trim 2017_11_30 Terry hanging double doors 2017_12_01 Insulation 1 2017_11_30 Terry hanging doors 2017_12_12 Terry installing trim 2017_12_01 Insulation 2 2017_12_01 Insulation 3 2017_12_01 Insulation 4 2017_12_01 Insulation 5 2017_12_01 Insulation 6 2017_12_01 Lauren cleaning the floors 2 2017_12_01 Lauren cleaning the floors 2017_12_01 Pouring east slab 1 2017_12_01 Pouring east slab 2 2017_12_01 Pouring east slab 3 2017_12_01 Pouring east slab 4 2017_12_01 Pouring east slab 5 2017_12_01 Pouring east slab 6 2017_12_01 Pouring east slab 7 2017_12_01 Pouring east slab 8 2017_12_01 Pouring east slab 9 2017_12_02 Cleaning shop floor 1 2017_12_02 Cleaning shop floor 2 2017_12_01 Pouring east slab 10 2017_12_02 Cleaning shop floor 3 2017_12_02 Cleaning shop floor 4 2017_12_02 Mark sawing the east concrete 2017_12_02 Sealing the concrete 2017_12_08 RMP Toby installing rotary converter 2017_12_08 Toby installing the rotary converter 2017_12_12 Building pallet racks 2017_12_14 Scott building shipping workstation 2017_12_15 David Page Scott packing paper 2017_12_16 Foreign languages moved 2017_12_16 Moving Gaylord boxes 2017_12_19 First machines moved 2017_12_20 Carter and Tyler 2017_12_20 Moving shelves 2017_12_19 Moving the Ricoh 2017_12_20 Our Hazelwood moving friends 2018_01_10 Carol cutting tracts 2018_01_10 Folder_cutter area

Comments